DBI Consultants Logo

DBI Consultants

Senior Scheduling Manager, Schedule & Delay

Posted Yesterday
Be an Early Applicant
In-Office
New York, NY, USA
100K-150K Annually
Senior level
In-Office
New York, NY, USA
100K-150K Annually
Senior level
Leads forensic delay analysis, construction schedule evaluation, and builder’s risk or delay-in-completion claims assessment. Reviews contracts, change orders, and project records; prepares expert reports and presentations; collaborates with attorneys, insurers, and contractors; supports dispute resolution and negotiations; and may provide expert testimony. The role supervises or quality-reviews others, requires field investigation in damaged or catastrophe-affected locations, and involves approximately 30% travel with occasional nonstandard hours.
The summary above was generated by AI

Job Description

The DBI team specializes in the evaluation of damaged structures. DBI’s construction experts provide independent recommendations and analysis to clients in the insurance and legal industry. Hard evidence, expertise, and accuracy drive work; communication and connection are the company’s top priorities. In a complex industry, the company’s mission is to bring clarity to every client served by DBI.

We are organized into seven regions, made up of 28 offices in major metropolitan areas across the U.S. We have additional experts in key cities and our teams work on projects in the U.S., Europe, the Middle East, the Caribbean, and Latin America.

The salary for this position is $100k-150k depending on experience and skillset. Employees receive a competitive salary plus the opportunity for two performance/profit-based bonuses in June and December annually.

The Senior Scheduling Manager is a highly skilled leader and team member who has expertise in scheduling, forensic delay analysis, and construction claims evaluation. This role involves analyzing construction schedules, investigating project delays, and preparing expert level reports to support insurance carriers and legal teams in resolving disputes.

PRIMARY JOB RESPONSIBILITIES:
  • Conduct forensic delay analysis to assess project delays and disruptions.
  • Evaluate construction schedules (baseline, updates, and impacted schedules) to determine causes of project delays.
  • Assess and analyze builder’s risk and delay in completion insurance claims.
  • Review contracts, change orders, and project documentation for delay-related impacts.
  • Prepare detailed reports and presentations summarizing findings.
  • Work closely with attorneys, insurers, and contractors to provide expert analysis.
  • Assist in dispute resolution and claims negotiations.
  • Provide expert testimony if required.
  • Uphold the values of DBI Consultants and the culture espoused by Our Foundation.
  • Consistently demonstrates professionalism, integrity and the highest standards of ethical behavior and professional conduct; conducts oneself in a manner that reflects favorably on the organization.
  • Maintain the confidentiality of proprietary and sensitive information, exercising sound judgment and discretion in any disclosure of information related to DBI Consultants and its endeavors.
  • Commits to continuous improvement and professional development for self and team members.
  • Perform all other duties as assigned.
REQUIRED QUALIFICATIONS:
  • Bachelor’s degree in construction management, civil engineering, or a related field.
  • Minimum of Seven years of relevant experience in construction scheduling, forensic analysis, and claims consulting.
  • Two years in a supervisory or quality review capacity overseeing the work of others.
  • Advanced proficiency in Primavera P6 and other scheduling software.
  • Advanced understanding of critical path method (CPM) scheduling and forensic schedule analysis methodologies.
  • Advanced experience with insurance claims related to construction delays (builder’s risk, delay in completion, etc.).
  • Expert knowledge of contract documents, industry standards (AACE, SCL Protocol), and dispute resolute process.
  • Excellent written and verbal communication skills.
  • Ability to work independently, manage others, and provide expert-level analysis under tight deadlines.
  • Experience working with insurance carriers and legal teams on construction claims.
  • Certification such as PMP, PSP (AACE), CCE, or equivalent is a plus.
  • Prior experience as an expert witness is a plus.
  • Exceptional organization skills and maintains professional demeanor.
WORKING CONDITIONS

This position often requires on-site work at locations where property damage or loss has occurred, including disaster or catastrophe areas. Travel and work during evenings, overnight, and weekends may be required. The role may involve exposure to outdoor conditions such as extreme heat, cold, or precipitation, as well as indoor environments with noise, vibration, moving equipment, electrical currents, chemicals, fumes, odors, dust, or poor ventilation.

PHYSICAL ACTIVITIES AND REQUIREMENTS:

In addition to the working conditions and associated physical activities and requirements above, the incumbent may be required to climb, balance, stoop, kneel, crouch, crawl, reach, stand, walk, push, pull, lift, finger, grasp, or feel, especially in the course of investigating and assessing property damage; these requirements may include the need to lift weights of up to 50 pounds, including a ladder.

Willingness to travel on average of +/- 30% of the workweek to accommodate meetings, as well as attend other work-related activities that may be scheduled outside of normal daytime business hours.

Similar Jobs

28 Minutes Ago
Hybrid
2 Locations
160K-177K Annually
Senior level
160K-177K Annually
Senior level
Artificial Intelligence • Healthtech • Professional Services • Analytics • Consulting
Consults with clients on marketing technology, customer data, and customer experience transformation. Leads strategy, solution design, implementation, activation, analytics, and performance measurement for customer engagement initiatives. Translates business goals into scalable technology solutions, guides data integration and solution roadmaps, manages project delivery, facilitates workshops, supports proposals and business cases, and mentors junior consultants.
Top Skills: AnalyticsCloud Technology SolutionsCustomer Data Platforms (Cdps)Customer Engagement TechnologiesData IntegrationMarketing Automation PlatformsReporting
35 Minutes Ago
Hybrid
New York, NY, USA
127K-160K Annually
Senior level
127K-160K Annually
Senior level
Artificial Intelligence • Fintech • Machine Learning • Mobile • Payments • Retail • Software
Partners with managers across multiple teams to provide HR guidance, coach on performance and development, manage employee relations, analyze people trends, support talent programs and organizational change, and strengthen employee experience, culture, and inclusion. The role collaborates with People & Workplace leaders and requires occasional travel. It is hybrid in New York City with in-office attendance three days per week.
36 Minutes Ago
Hybrid
New York, NY, USA
102K-129K Annually
Mid level
102K-129K Annually
Mid level
Artificial Intelligence • Productivity • Sales • Software
Manage strategic B2B customer relationships as a Technical Customer Success Manager. Advise clients on using monday.com’s AI platform to automate workflows, generate insights, and drive business transformation. Lead technical consultations, workshops, adoption strategies, change management, and expansion opportunities. Analyze product usage data, troubleshoot integration logic, communicate with executives, and represent customer needs to Product and Engineering teams.
Top Skills: Ai PlatformsAPIsGenerative AiMonday.ComSoftware Integrations

What you need to know about the NYC Tech Scene

As the undisputed financial capital of the world, New York City is an epicenter of startup funding activity. The city has a thriving fintech scene and is a major player in verticals ranging from AI to biotech, cybersecurity and digital media. It also has universities like NYU, Columbia and Cornell Tech attracting students and researchers from across the globe, providing the ecosystem with a constant influx of world-class talent. And its East Coast location and three international airports make it a perfect spot for European companies establishing a foothold in the United States.

Key Facts About NYC Tech

  • Number of Tech Workers: 549,200; 6% of overall workforce (2024 CompTIA survey)
  • Major Tech Employers: Capgemini, Bloomberg, IBM, Spotify
  • Key Industries: Artificial intelligence, Fintech
  • Funding Landscape: $25.5 billion in venture capital funding in 2024 (Pitchbook)
  • Notable Investors: Greycroft, Thrive Capital, Union Square Ventures, FirstMark Capital, Tiger Global Management, Tribeca Venture Partners, Insight Partners, Two Sigma Ventures
  • Research Centers and Universities: Columbia University, New York University, Fordham University, CUNY, AI Now Institute, Flatiron Institute, C.N. Yang Institute for Theoretical Physics, NASA Space Radiation Laboratory

Sign up now Access later

Create Free Account

Please log in or sign up to report this job.

Create Free Account